ESB and the Land Development Agency (LDA) have reached an agreement on the transfer of a site at Wilton in Cork, which has the potential to deliver 350 homes. The land being transferred by ESB is located at the energy utility’s Sarsfield Road site in Wilton. The LDA has already appointed a design team for […]
The Shannon Airport Group and ESB have completed a major lighting project which will see Shannon Airport’s energy consumption in lighting cut by two thirds. The project, funded through ESB’s Smart Energy Services saw the replacement of over 4,000 indoor and outdoor lighting with ultra-modern LEDs bulbs. The 66 per cent reduction will see the airport’s energy consumption in lighting reduced to 442 thousand kWh from 1.37 million kWh. The project involved upgrading existing lights across the terminal building, car parks […]
A new large Grade A office development comprising over 26,000 square metres of net lettable floor area in two distinct office blocks has commenced construction in Dublin’s prime Merrion Square area. The redevelopment of ESB’s site on Fitzwilliam Street Lower, which is effectively an entire city block, was given the green light by An Bord […]
ESB and Bord na Móna have announced a co-development agreement to develop solar power in four locations in Roscommon, Offaly and Kildare, which will provide renewable energy to power the equivalent of 150,000 homes. The joint venture will access part of Bord na Móna’s land bank in strategic locations across the Midlands which is suitable […]